Defence Enclave Scheme

S.No. Head Total Proposed Developed Under Development
1
Zonal Road (k.m.)
1.95
2 Internal Road (k.m.) 4.70
3 Water Supply (k.m.) 6.65
4 Sever (k.m.) 6.65
5 Storm Water Drain (k.m.) 1.70
6 Internal Drains (k.m.) 11.60
7 Electricity Work (Sub Station) 33/11 K.V. 132/33 K.V.
1
1
8 Park (No’s) 15
9 Tubewell (No’s) 2
10 High Tanks (No’s) 1
11 Sewer Treatment Plant (No’s)