| S.No. | Head | Total Proposed | Developed | Under Development |
|---|---|---|---|---|
|
1
|
Zonal Road (k.m.)
|
—
|
1.80
|
—
|
| 2 | Internal Road (k.m.) | — | 7.23 | — |
| 3 | Water Supply (k.m.) | — | 8.6 | — |
| 4 | Sever (k.m.) | — | 8.58 | — |
| 5 | Storm Water Drain (k.m.) | — | — | — |
| 6 | Internal Drains (k.m.) | — | 15.27 | — |
| 7 | Electricity Work (Sub Station) 33/11 K.V. 220/132/33 K.V. | — — |
— — |
— — |
| 8 | Park (No’s) | — | 6 | — |
| 9 | Tubewell (No’s) | — | 3 | — |
| 10 | High Tanks (No’s) | — | 2 | — |
| 11 | Sewer Treatment Plant (No’s) | — | 1 | — |